SPEEDTECH B58 F2X/F3X/G01(GEN1) PULSAR 6262G KIT - NONE/OPEN DUMP / NON-CERAMIC / STANDARD/Charge pipe without BOV port
is backordered and will ship as soon as it is back in stock.
T4 Manifold with studs and nuts (Ceramic or Non-Ceramic options)
2 piece Stainless Steel Tubing (*If you will be fabricating your own and would like to delete our 2 piece tubing parts from your order, email us for a discount code)
Stainless Steel Wastegate Pipe - (Recirculating or Open Dump options)
V-band clamps
Stainless Braided -4AN Oil Feed Hose, AN Fittings
Stainless Braided -10AN Oil Drain Hose
Stainless Steel -10AN Turbo Drain Fitting
Stainless Steel -10AN To Engine Block Fitting
Stainless Braided -4AN Coolant Feed Line (To/From Turbo), AN Fittings
Aluminum 3-piece Charge Pipe (with or without BOV port options)
Silicone Couplers
Wastegate (Choice of Turbosmart Hypergate, TiAL MVR, PSR 45mm or you may choose to purchase the kit without a wastegate)
LEAD TIME: Lead time on a Pulsar kit is generally 2 to 4 weeks.
Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.
Your cart
Speedtech LLC
SPEEDTECH B58 F2X/F3X/G01(GEN1) PULSAR 6262G KIT
From$4,500.00
Unit price /
Unavailable
INCLUDED IN THE KIT:
Pulsar PSR 6262G T4 Divided, 0.85 A/R Turbo
T4 Manifold with studs and nuts (Ceramic or Non-Ceramic options)
2 piece Stainless Steel Tubing (*If you will be fabricating your own and would like to delete our 2 piece tubing parts from your order, email us for a discount code)
Stainless Steel Wastegate Pipe - (Recirculating or Open Dump options)
V-band clamps
Stainless Braided -4AN Oil Feed Hose, AN Fittings
Stainless Braided -10AN Oil Drain Hose
Stainless Steel -10AN Turbo Drain Fitting
Stainless Steel -10AN To Engine Block Fitting
Stainless Braided -4AN Coolant Feed Line (To/From Turbo), AN Fittings
Aluminum 3-piece Charge Pipe (with or without BOV port options)
Silicone Couplers
Wastegate (Choice of Turbosmart Hypergate, TiAL MVR, PSR 45mm or you may choose to purchase the kit without a wastegate)
LEAD TIME: Lead time on a Pulsar kit is generally 2 to 4 weeks.